“C&C’s knowledge, input and commitment to the project was key to the success of the project. I personally thank them for assisting the Willmott Dixon site team at Bowdon Church School.”

Darrell Cullen
Willmott Dixon

With a new school constructed alongside the former building, a move over the summer holidays was essential to ensure minimal disruption to students and staff.

Whilst both existing and new equipment was transferred to the new dining hall facilities, the projected increasing student intake of the school was a high priority. This demanded extra space to be allowed in the design for the future drainage, power supplies, and additional space for alternative models that may be available when older existing kit requires replacement.

Careful coordination with Willmott Dixon and the M&E contractor was vital, for example in allowing successful repositioning of the vent canopy, which lead to C&C’s Project Manager Andy Pace handing over the tightly programmed scheme in time and on budget.

C&C’s Project coordinator Steve Brophy commented, “It was great to be part of a project at such a leading school. A great deal of planning was required, and we’re proud that the end result reflects the attention to details and coordination with all those involved.”

Get in touch

Head Office

C&C Catering Equipment Ltd
1 Smithy Farm
Chapel Lane
Saighton
Chester
CH3 6EW

01244 625170

info@cateringequipment.com

Copyright C&C Catering Group | website by CreationADM