C&C Catering Equipment complete amazing new kitchen and front of house space for leading online retailer.

Working with main contractor Overbury and Stuart Wilcox of Tricon Foodservice Consultants, C&C have successfully completed a further high-profile commercial kitchen project in London showcasing exceptional craftsmanship and attention to detail.

The project spanned multiple floors, with the first phase successfully completed in February 2023, followed by the second phase focusing on the main kitchen ground floor from May to July.

Overbury’s flexibility and cooperation were instrumental in the project’s success, with install teams praising Colin Richens and his team for their professionalism and expertise. The positive feedback echoes in the impeccable finish of the completed project.

Key Project Details

Main Brands Used: The project featured equipment and materials from industry-leading brands, including Proline Counters, Essex Fabrication, Ambach Cooking Equipment, Rational, Mechline, Green Cooling Cold Rooms, True Refrigeration and Winterhalter Warewashing Equipment.

Areas of Work: C&C’s skilled multidisciplinary team undertook the transformation of the Level 9 Pantry Area, Ground Floor Main Kitchen, and Front of House Counter space, demonstrating their expertise in these diverse project environments.

Challenges Overcome: Led by project manager Colin Richens and the Overbury team, the project encountered its fair share of challenges, as is common in almost every construction project. However, the installation team efficiently navigated through these adjustments and tweaks, resulting in a seamless and impressive final outcome.

Get in touch

Head Office

C&C Catering Equipment Limited
Quarry Buildings
Hill Road
Eccleston
Chester
CH4 9HQ

01244 625170

info@cateringequipment.com

Copyright C&C Catering Group | website by CreationADM