“It’s great to have delivered another prestigious project in London, and we’re delighted with the outcome at Metaswitch. We overcame some logistical challenges with careful planning and are very pleased with what was achieved at this fantastic site.”

Keith Hartharn
Senior Project Manager

Involved with the project from February 2020, C&C Catering Equipment Ltd undertook works at the modern workspace on the main kitchen and servery on the fourth floor, and pantry on the ground floor.

Brands on the project included Proline, Meiko, Halton, Essex Fabs, and Ambach, with McLaren as Main Contractor and Tricon as Consultant.

A logistical challenge on the scheme involved the delivery of the equipment into the building, all of which had to be craned in through glazed sections of the terrace on the fourth floor on a very busy road.

This was overcome by working hard to ensure all equipment was manufactured and delivered in manageable sections to be lifted via crane.

Get in touch

Head Office

C&C Catering Equipment Ltd
1 Smithy Farm
Chapel Lane
Saighton
Chester
CH3 6EW

01244 625170

info@cateringequipment.com

Copyright C&C Catering Group | website by CreationADM