Valued at approximately £180k, C&C worked closely alongside Main Contractor Clugston and Catering Consultants Merritt-Harrison to ensure the project ran smoothly and successfully from start to finish.
The refurbishment of the catering facilities at Royal Hallamshire Hospital included two phases. The first being the refurbishment of the ‘D Floor’ Hospital Restaurant and the second being a Coffee Shop.
With fabrication from Counterline, refrigeration from Foster and cooking equipment from MKN in the servery area, the handover was met with great satisfaction from all involved.
Get in touch
Head Office
C&C Catering Equipment Limited
Quarry Buildings
Hill Road
Eccleston
Chester
CH4 9HQ
01244 625170
info@cateringequipment.com
Copyright C&C Catering Group | website by CreationADM