Working closely with the same team as Pippin, C&C teamed up with Main Contractor Overbury as well as Consultant Humble Arnold to deliver the high standard set and expected by all parties.
The project, valued at approximately £190k, was designed and specified by Humble Arnold and used existing equipment wherever possible to keep the clients costs to a minimum.
After being appointed, C&C were requested to carry out further work with Overbury with regards to the wall finishes. The installation was brought to a smooth ending and we ensured that the Quality Assurance and Snag Inspections were completed and signed off.