C&C Equip London’s Hottest New Restaurant

Sushi Samba based in the Heron Tower is London’s hottest new venue with a reported 2 months waiting list already. We were delighted to win the contract and are even happier with the end result.

Working alongside American Foodservice Consultants, Next Step Design ; Main Contractors BW Interiors and Built Asset Consultants EC Harris, the project was completed within a very tight time-scale. We carried out a phased installation programme commencing with the Basement Production Kitchen and followed by the service facilities on floors 38, 39 and 40, within 10 weeks of appointment.

With the beautiful Sushi Samba restaurant on the 38th floor offering a spectacular terrace view of central London, floors 39 and 40 are home to a fabulous cocktail bar and new 24 hour concept restaurant respectively.

(Apologies for the number of images but we think the subject matter justifies it!)

In addition to the challenge of working to such a tight time-scale, C&C’s team were asked to design and install extremely complex curved elliptical champagne, sake and wine fridges with bespoke glazing and full height glazed doors together with a bespoke refrigeration pack system to serve them.  This pack was required to be minimal in both width and height, due to imposed roof platform restrictions on the Heron Towers site.

Further challenges included physically accessing the floors to deliver the various items of equipment.  With no large goods lift running beyond level 38, a jig was configured to hoist and lift the bespoke Rosinox cooking suite in individual pieces up to level 40. This was then welded together and polished to the manufacturer’s required standard in situ, with Rosinox’s UK agent Dawson MMP arranging for the necessary specialist equipment needed to complete the task.

C&C Equip London’s Hottest New Restaurant

Sushi Samba based in the Heron Tower is London’s hottest new venue with a reported 2 months waiting list already. We were delighted to win the contract and are even happier with the end result.

Working alongside American Foodservice Consultants, Next Step Design ; Main Contractors BW Interiors and Built Asset Consultants EC Harris, the project was completed within a very tight time-scale. We carried out a phased installation programme commencing with the Basement Production Kitchen and followed by the service facilities on floors 38, 39 and 40, within 10 weeks of appointment.

With the beautiful Sushi Samba restaurant on the 38th floor offering a spectacular terrace view of central London, floors 39 and 40 are home to a fabulous cocktail bar and new 24 hour concept restaurant respectively.

(Apologies for the number of images but we think the subject matter justifies it!)

In addition to the challenge of working to such a tight time-scale, C&C’s team were asked to design and install extremely complex curved elliptical champagne, sake and wine fridges with bespoke glazing and full height glazed doors together with a bespoke refrigeration pack system to serve them.  This pack was required to be minimal in both width and height, due to imposed roof platform restrictions on the Heron Towers site.

Further challenges included physically accessing the floors to deliver the various items of equipment.  With no large goods lift running beyond level 38, a jig was configured to hoist and lift the bespoke Rosinox cooking suite in individual pieces up to level 40. This was then welded together and polished to the manufacturer’s required standard in situ, with Rosinox’s UK agent Dawson MMP arranging for the necessary specialist equipment needed to complete the task.

Get in touch

Head Office

C&C Catering Equipment Limited
Quarry Buildings
Hill Road
Eccleston
Chester
CH4 9HQ

01244 625170

info@cateringequipment.com

Copyright C&C Catering Group | website by CreationADM